Thermal Insulation Board Adhesive Mortar: Bonding mortar for securing insulation boards, ensuring efficient thermal insulation installation.
- Product Detail
It is a cement-based, thermal insulation board adhesive mortar with high adhesion strength, reduced slip, and safer adhesion with polymer additives.
- Usage Areas
Warm sheet adhesive; It is used for bonding thermal insulation boards such as XPS, EPS, Platinum and Rockwool in all buildings, indoors and outdoors
- Product Advantages
- It provides high adherence and strength in application.
- It does not slip on vertical surfaces.
- Easy to prepare and apply.
- Technical Table
The porous unit volume mass of the adhesive | >1000 kg/m3 | TS EN 1015 − 6 |
---|---|---|
30 min. amount of water absorption at the end | < 5 g | TS EN 12808 − 5 |
240 min. amount of water absorption at the end | < 10 g | |
Bending strength | > 2 N/mm² | TS EN 1015 − 11 |
Compressive strength | > 6 N/mm² | TS EN 1015 − 11 |
Sieve analysis (over 1 mm) | Max %1 | TS EN 1015 − 1 |
Adhesion strength to heat insulation board | > 0,08 N/mm² | TS EN 13494 |
Adhesion strength to substrate | > 0,50 N/mm² | TS EN 1015 − 12 |
Reaction to fire class | A1 | TS EN 13501 − 1 |
These values are in laboratory conditions; It was obtained as a result of experiments carried out in 23 ± 2˚C and 50% ± 5% relative humidity environment. The values given in the table may differ depending on the surface and ambient conditions.
Aplication Procedure
- Surface Preparation
- The surface should be dry, clean, sound and free of dust, oil, dirt or materials preventing adhesion should be cleaned from the surface, and materials such as mortar and cement residues should be scraped.
- When used as a correction plaster, surface defects with a depth of more than 1 cm should be repaired 24 hours before the application.
- Application Methods
- If there are curvatures on the surface, Warm is applied continuously along the four sides of the thermal insulation board and in three heaps in the middle of the board. Care should be taken that the adhesive does not overflow to the edges of the sheet.
- If the surface is very smooth, Warm board adhesive can be applied to the back of the board with a 10×10 notched trowel using the carding method.
- Care should be taken that Warm board adhesive does not form a film on the surface during application. Insulation boards adhered with Baumix board adhesive should be anchored after a minimum of 24 hours, and then plaster should be applied to the boards with Baumix board plaster.
- Application Suggestions
- The product should be used within the pot life after mixing. Products that have expired during the application should never be used.
- No foreign materials such as lime, cement, plaster should be added to the prepared mortar.
- Extra water should not be added to the mixture.
- Application should not be made on unstable surfaces. The strength and carrier of old surfaces should be checked before bonding.
- During and after the application, the surface should be protected from air currents and contact with water should be prevented.
- It should not be applied on surfaces where there is danger of frost within 24 hours, frozen or melting frost.
- Care should be taken not to expose the material to direct sunlight in hot weather and the mixture should be made with cold water.
- Application should not be made on extremely windy or hot surfaces exposed to direct sun.
- Application should not be made in rainy weather, the application surface should be protected from rain for 24 hours.
Surface and Ambient Temperature During application, the surface and ambient temperature must be between 5˚C and 30˚C.
- Application Limits
Usage time of the prepared mortar
− Pot life Maximum 1 hour
The time required for doweling on the pasted insulation board is 24 hours.
These values are in laboratory conditions; It was obtained as a result of experiments carried out in 23 ± 2˚C and 50% ± 5% relative humidity environment. The values given in the table may differ depending on the surface and ambient conditions.
Aplication Instruction
Mixing ratio
For 25 kg package, 4.0 −6.0 liters of water should be added.
- Mixing Equipment
- Low speed electric mixer (400 rpm)
- Special tip mixing equipment
Mixing time It should be mixed with the help of a low-speed mixer so that there are no dry powders and lumps. Mortar 3-4 min. 1−2 minutes before application after resting. should be mixed again.
- Application Equipment
- Notched steel trowel (for carding method)
- Steel trowel
- Equipment Cleaning
After the application, the mortar on the used equipment should be cleaned with water before it dries.
Technicial Specifications
Chemical Base: Cement based, polymer added, adhesive mortar Dry
- Density: 1.45 ± 0.1 gr/cm3
- Mortar Density: 1,ϳ0 ± 0.1 gr/cm3
- Grain Size: ч 800 ʅm Color: Gray
- Consumption / Consumption
Recommended consumption amount for 1 m² application; 4.5 − 5.5 kg. This value may vary depending on the surface and ambient conditions.
- Packaging
Warm board adhesive; in 25 kg kraft bags,
- Shelf Life
Shelf life is 6 months when stored in its unopened original package, in a dry (max. 60% relative humidity) and cool (temperature between н5˚C and н25˚C) environment.
- Storage Conditions
It should be stored in its unopened original package, in a dry (max. 60% relative humidity) and cool (temperature between 5˚C and 25˚C) environment. It should not be left under direct sunlight.
The mouth of the containers should be tightly closed when not in use.
- Warnings
R36/38 : Irritating to eyes and skin.
R43: May cause sensitization and sensitization by skin contact.
S2 : Keep out of reach of children.
S24/25 : Avoid contact with eyes and skin
S26 : In case of contact with eyes, rinse immediately with plenty of water and seek medical advice.
S28 : In case of skin contact, wash immediately with plenty of water.
S37 : Appropriate protective gloves should be used.